Construction next to an operating hospital means patients, staff and equipment are only metres away.
We agreed every shutdown and tie-in with clinical teams weeks ahead, and monitored dust and vibration around the clock.
The result was zero unplanned service outages over 30 months.
More insights

Safety
How we reached 1,400 days without a lost-time injury
Daily pre-task briefings, stop-work authority and real-time reporting changed how our crews think about risk.

Engineering
Tilt-up vs steel frame for logistics buildings
When each system wins on cost, speed and future flexibility for large-footprint warehouses.

Delivery
Five questions to ask before you choose design & build
Design & build can save months, but only if the brief, budget and decision-making are ready for it.