P-021

Client
Meridian Health System
Location
Boise, ID
Sector
Healthcare & Education
Status
Completed
$112M
Contract value
31,200 m²
Gross area
30
Months on site
840,000
Safe work hours
The pavilion connected to a live hospital at three levels, and imaging suites needed vibration-free floors.
Every MEP system was coordinated in a federated model and prefabricated in corridor racks.
Tie-ins to the existing hospital were scheduled with clinical teams during overnight windows.
The pavilion opened with zero unplanned service outages to the main hospital during construction.